CSP-11 CSP-11 D2.06 · Domain 2 · Program Management · 25%

ETA Boolean

An event tree asks for the probability of a consequence path. Someone adds when they should multiply along a path, or multiplies across mutually exclusive end states incorrectly.

Updated . Independent CSP-11 practice. Not BCSP-endorsed. No pass guarantee.

Decision rule

ETA walks forward from an initiator. Success and failure branches both matter.

A pretty tree with no probabilities still shows order.

In 20 seconds

  • ETA walks forward from an initiator.
  • Success and failure branches both matter.
  • ETA develops forward from an initiating event through success/failure branches.
  • Boolean combinations of branch probabilities need independence honesty.

How to apply ETA Boolean

THEORY: Initiating event → barrier success/fail → outcomes. Shared barriers are not two events. CALC: If P given and independent, multiply along a path. FIELD: Vent path assumed always open. Add the fail branch. ASSESS: Stopping at the first success is the trap.

Worked case

Wrong first move: Draw only the happy path. Correct move: Branch success and failure; test independence.

Why the rule holds

Related: 23, 120.

Same rule, different setting

On a production platform or plant, eta boolean shows up when operations push throughput while a higher control is still open. Event tree analysis (ETA): initiate → ordered branch successes/failures → path probability = product along the path (independent branches as assumed). Prefer a system/design fix over a polished lower-row program that keeps the wells online.

On a busy jobsite, eta boolean shows up when schedule pressure sells a permit, rotation, or PPE package while design still can change. Event tree analysis (ETA): initiate → ordered branch successes/failures → path probability = product along the path (independent branches as assumed). Discriminate the open row before you laminate another card.

Picture / model

Framework → compute/classify → reject distractors → prefer system/design.

Exam traps

Original SafePath contrasts for ETA Boolean. These are study traps, not recalled BCSP items.

TrapCorrect read
Path probabilityProduct along branches
End-state setOften partitions — sums ≈1
Success branchAs labeled
Failure branchAs labeled
FTA vs ETACauses vs event progression

Field move

Path probability = 0.9 × 0.8 = 0.72.

Scenarios

Scenario 1 · Applied Scenario · CSP-11 D2.06

An event tree path has two independent success probabilities 0.9 then 0.8 on one path. Path probability?

Best action: 0.72

Why: Independent successes on one event-tree path multiply: 0.9 × 0.8 = 0.72. Adding them gives 1.70, which is not a probability of one path.

Scenario 2 · Applied Scenario · CSP-11 D2.06

Initiating event 0.02/y times path conditional probability 0.15. Consequence frequency?

Best action: 0.003 /y

Why: 0.02 per year times the conditional probability 0.15 is 0.003 per year. Adding the two numbers, or reporting either input alone, does not give the consequence frequency.

Scenario 3 · Applied Scenario · CSP-11 D2.06

A branch is labeled Boolean 'OK' after a safeguard succeeds. Meaning on the tree?

Best action: That branch follows the success outcome of the asked event

Why: Evaluate the best response. Failure modes, five-why, and barrier questions answer different problems. A five-why that ends in complacency misses a missing engineered barrier. Design that removes the initiator beats a laminated tree. Mean time between failures is not a reason to skip inspection. Thi…

If the stem says this

Stem signalBest direction
initiating event can be eliminatedprefer elimination
branches assumed independent wronglymodel dependence
need sequence from initiatorETA appropriate
two answers workhigher hierarchy / system / design
layer success probability optimisticchallenge with proof-test data

Check before you leave

  • ✓ ETA develops forward from an initiating event through success/failure branches.
  • ✓ Boolean combinations of branch probabilities need independence honesty.
  • ✓ Protective layers appear as success branches that avert outcomes.
  • ✓ Common-cause can correlate branches.
  • ✓ Use ETA results to improve barriers earlier.
  • ✓ Wrong tool if the need is only component FMEA without sequence.

Blueprint mapping

ETA Boolean is the SafePath study class for CSP-11 D2.06 inside CSP-11 Domain 2, Program Management (25%). A high-weight management domain focused on measuring performance, investigating incidents, managing change, building systems, leading people, controlling records and resources, and interpreting data.

SafePath uses the publicly posted CSP-11 outline as a study map. It does not reproduce official exam content, and it is not affiliated with or endorsed by BCSP or Pearson VUE.

Domain 2: Program Management

Practice / flashcards / formulas

More classes in Program Management

Nearby lessons mapped to the same CSP-11 domain.

CSP-11 D2.06

Other classes on this task

ETA Boolean study questions

What decision does the ETA Boolean class train?
ETA walks forward from an initiator. Success and failure branches both matter. This is independent SafePath CSP practice for CSP-11 D2.06. It is not an official BCSP item and it is not a pass guarantee.
What exam trap shows up in ETA Boolean?
A common miss treats this as sufficient: Path probability The stronger read is: Product along branches
How does ETA Boolean map to the CSP-11 blueprint?
SafePath maps this class to CSP-11 D2.06 in Domain 2, Program Management (25% of the published blueprint). Use the public outline for study planning. SafePath is not affiliated with or endorsed by BCSP.