Skip to main content
SafePath CSPIndependent CSP-11 exam preparation
Type to filter links. Tab to a result. Escape closes results.
Checking account…

CSP-11 CSP-11 D2.10 · Domain 2 · Program Management · 25%

1904 Clocks

At 07:10 a plant learns that a forklift collision has caused a worker’s death. At 19:40 the same day, a supervisor confirms a separate work-related press amputation. The manager says, “Both are serious, so both use the 8-hour rule; we can call the Area Office tomorrow.” You are the CSP. Decide which event uses the 8-hour deadline, which uses 24 hours, and what facts must be checked before either clock is applied.

Updated . Independent CSP-11 practice. Not BCSP-endorsed. No pass guarantee.

Decision rule

1904 is a recording-and-clocks system. Do not treat the 300 log as medical care or as hierarchy.

Work-relatedness, new case, days away / restricted, privacy of the 301.

In 20 seconds

  • 1904 is a recording-and-clocks system.
  • Do not treat the 300 log as medical care or as hierarchy.
  • 1904 recordkeeping clocks: work-relatedness, severity, day counts.
  • Count calendar days for days away/restricted — know what the stem asks.

How to apply 1904 Clocks

THEORY: OSHA recordkeeping: count calendar days, not scheduled workdays. Privacy — do not post diagnoses. A recordable is not automatically a failed engineering control, and a non-recordable is not automatically safe. CALC: If day of injury is day 0 and return is day 8, count the intervening calendar days as given in the stem. FIELD: Supervisor wants the 301 on the break-room board. Keep case detail restricted; post only what 1904 allows. ASSESS: Changing the story so the case drops off the log instead of fixing the guard is the trap.

Worked case

Wrong first move: Hide the case. Correct move: Record it correctly; fix the energy; protect medical detail.

Why the rule holds

Related: 32, 96, 106.

Same rule, different setting

A vacuum-truck fatality at 07:10 and an amputation at 19:40 land on the same pad day. The superintendent says “everything serious is 8 hours — call Area Office in the morning.” You are the CSP. The question is 1904.39: which clock is 8 hours and which is 24.

A crane fatality at 07:10 and an amputation at 19:40 land on the same site day. The PM says “everything serious is 8 hours — call Area Office in the morning.” You are the CSP. The question is 1904.39: which clock is 8 hours and which is 24.

Picture / model

Solve OSHA severe-event reporting questions by building a three-time-line record: work incident, qualifying outcome, and employer or agent knowledge. First test whether the fatality or listed nonfatal outcome occurred within its regulatory window; then apply the 8-hour or 24-hour notification rule, including delayed-knowledge provisions when applicable. Keep OSHA reporting separate from injury-and-illness recording.

Exam traps

Original SafePath contrasts for 1904 Clocks. These are study traps, not recalled BCSP items.

TrapCorrect read
FatalityReport to OSHA within 8 hours of learning
In-patient hospitalization, amputation, loss of an eyeReport within 24 hours of learning
300-log recordable (1904.7)May not be 1904.39-reportable (e.g., restricted duty, stitches rules)
First aidNeither 300-log recordable (as first aid) nor 1904.39
Fire-watch 30/60 min or STEL 15 minNot reporting clocks — do not import them

Field move

Field decision: Within eight hours of learning of the fatality, assuming the outcome meets the rule's occurrence condition..

Scenarios

Scenario 1 · Fundamental · CSP-11 D2.10

A work-related fatality occurs at 07:10 and the employer learns immediately. When is the OSHA severe-event report due under 29 CFR 1904.39?

Best action: Within eight hours of learning of the fatality, assuming the outcome meets the rule's occurrence condition.

Why: Evaluate the best response. 1904.39 clocks depend on the outcome and when the employer learns of it. Recording, first aid, and the investigation do not replace or pause the severe-event report. A work-related fatality occurs at 07:10 and the employer learns immediately. When is the OSHA severe-even…

Scenario 2 · Fundamental · CSP-11 D2.10

An employee's work-related fingertip amputation occurs at 19:40 and the employer learns at 19:45. Which notification period applies?

Best action: Twenty-four hours after employer knowledge of the qualifying amputation.

Why: Evaluate the best response. 1904.39 clocks depend on the outcome and when the employer learns of it. Recording, first aid, and the investigation do not replace or pause the severe-event report. An employee's work-related fingertip amputation occurs at 19:40 and the employer learns at 19:45. Which n…

Scenario 3 · Fundamental · CSP-11 D2.10

A work-related incident occurs Monday 10:00; the worker is formally admitted for treatment Tuesday 02:00 and the employer learns of that admission at 02:15. How should the clocks be read?

Best action: Admission occurred within 24 hours of the incident; notify within 24 hours after employer knowledge at 02:15.

Why: Evaluate the best response. 1904.39 clocks depend on the outcome and when the employer learns of it. Recording, first aid, and the investigation do not replace or pause the severe-event report. A work-related incident occurs Monday 10:00; the worker is formally admitted for treatment Tuesday 02:00…

If the stem says this

Stem signalBest direction
first aid only truly appliesdo not record as 301 injury if not required
days away counting askedcount calendar days per rule in stem
privacy case identifiers exposedprotect employee privacy
two answers workhigher hierarchy / system / design
reporting deadline in last sentencehonor the TIME requirement

Check before you leave

  • ✓ 1904 recordkeeping clocks: work-relatedness, severity, day counts.
  • ✓ Count calendar days for days away/restricted — know what the stem asks.
  • ✓ Privacy cases and employee privacy in records.
  • ✓ Do not use first-aid vs recordable confusion to hide cases.
  • ✓ New cases vs continuation rules matter.
  • ✓ Electronic vs paper systems still need accuracy and access rules.

Blueprint mapping

1904 Clocks is the SafePath study class for CSP-11 D2.10 inside CSP-11 Domain 2, Program Management (25%). A high-weight management domain focused on measuring performance, investigating incidents, managing change, building systems, leading people, controlling records and resources, and interpreting data.

SafePath uses the publicly posted CSP-11 outline as a study map. It does not reproduce official exam content, and it is not affiliated with or endorsed by BCSP or Pearson VUE.

Domain 2: Program Management

Practice / flashcards / formulas

More classes in Program Management

Nearby lessons mapped to the same CSP-11 domain.

CSP-11 D2.10

Other classes on this task

1904 Clocks study questions

What decision does the 1904 Clocks class train?
1904 is a recording-and-clocks system. Do not treat the 300 log as medical care or as hierarchy. This is independent SafePath CSP practice for CSP-11 D2.10. It is not an official BCSP item and it is not a pass guarantee.
What exam trap shows up in 1904 Clocks?
A common miss treats this as sufficient: Fatality The stronger read is: Report to OSHA within 8 hours of learning
How does 1904 Clocks map to the CSP-11 blueprint?
SafePath maps this class to CSP-11 D2.10 in Domain 2, Program Management (25% of the published blueprint). Use the public outline for study planning. SafePath is not affiliated with or endorsed by BCSP.

Verify

Verify: Confirm current certification requirements with BCSP and technical requirements with the cited authoritative standard.